Galiwinku, Gravity Sewer Project,
This project was conducted by PowerWater, Fred NT were the primary contractor. It’s main objective was to service a lot beside the airport for a new clinic to be built.
The works included
- 450m of DN300 up to depths of 4.5m
- 750m of DN225 up to depths of 6.0m
- 13 DN110 manholes, 6 of which were Tufflon P90 coated
- 4 future lot connections
- connections and decommissioning of two sewer pump stations
- 745m of DN150 PVC rising main