- 30kw pumps in swage pump station “Oenpelli”
- Elcho Island, emergency watermain repair a couple of days before Xmas.
- Heli lift Oenpelli
- Cahill’s crossing
- Cahill’s crossing
- new tank and inlet manifolds “Oenpelli”
- 8t chain trencher
- DN600 MSCL rising main
- Spark testing
- Shrink wraped joint
- Mag particle testing DN600 MSCL “tiger brennan drive”
- Temp. sewer pump well
- Anchor Block
- Bore platforms “Oenpelli”
- Oenelli
- Groote Is.
- Devils Marbles
- leaving Alice Springs for Darwin
- Day off after visiting Ayres Rock
- Transportable accomodation unit
- Mobilising to remote communities
- Sewage storage tanks “Oenpelli”
- Mixing backfill
- 3km of DN375 Rising main Alice Springs
- DN375 connections “Alice Springs”
- Alice Springs DN375 cut in’s
- 40t low loader Oenpelli
- Palumpa station
- Installing water rising main through swapland “Wadeye”
- Sewage pump station “Oenpelli”
- Sewage storage tanks “Oenpelli”
- Excavating for a infiltration gallery “Oenpelli”
- Trench shoring boxes for deep exavation
- DN300 knife gate valve “Oenpelli”
- Booster Assembly at CDU Darwin
- Typical Hydrant assembly at CDU Darwin
- Poly Butt Welding at CDU
- DN200 Valves on CDU fire main