-
Recent Posts
Image Gallery
Categories
Meta
Author Archives: garyfrednt
Oenpelli Sewer pit Install
09/10/12, Tuesday. Location Oenpelli, NT. Fred NT conducted the installation of the new pump station #2 base weighing 19.5 tonnes, and the new collection chamber base at pump station #1 weighing 12 tonne with a 80 tonne crane with a … Continue reading
Posted in Uncategorized
1 Comment