Fred NT conducted the installation of the new pump station #2 base weighing 19.5 tonnes, and the new collection chamber base at pump station #1 weighing 12 tonne with a 80 tonne crane with a 22 tonne counter weight.
all this went without a hitch, everyone work safely and efficiently, after holding a safety meeting before each lift to ensure that all personnel knew the dangers and roles expected of each other.
Thank you to AM Cranes for there help and experienced staff, to ensure all lifts were a success.

Well Done!!!

This entry was posted in Uncategorized. Bookmark the permalink.

1 Response to Oenpelli Sewer pit Install

  1. christayler says:

    Great photos!! They demonstrate the enormity and detail of this job. Congrats on the safety outcomes to all involved.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s